1 00:00:01,040 --> 00:00:06,869 i love you 2 00:00:10,150 --> 00:00:08,629 thank you for that song more by matthew 3 00:00:11,749 --> 00:00:10,160 west it's a great description of the 4 00:00:13,990 --> 00:00:11,759 beauty of this earth and a wonderful 5 00:00:15,990 --> 00:00:14,000 reminder of god's love for us so thanks 6 00:00:17,990 --> 00:00:16,000 for that and a special greeting to my 7 00:00:19,349 --> 00:00:18,000 wonderful wife margie and my great boys 8 00:00:21,510 --> 00:00:19,359 alex and jeffrey i hope you're having a 9 00:00:23,590 --> 00:00:21,520 great day and i miss them and look 10 00:00:25,189 --> 00:00:23,600 forward to seeing them 11 00:00:27,189 --> 00:00:25,199 this is mission control houston 12 00:00:29,029 --> 00:00:27,199 spacewalk preparations continue in the 13 00:00:31,189 --> 00:00:29,039 equipment lock section of the quest 14 00:00:33,590 --> 00:00:31,199 airlock you see mike fossum 15 00:00:36,950 --> 00:00:33,600 slithering his way into the upper torso 16 00:00:39,030 --> 00:00:36,960 of his extra vehicular mobility unit 17 00:00:41,670 --> 00:00:39,040 not the easiest task in the world but 18 00:00:43,910 --> 00:00:41,680 with the assistance of satoshi furukawa 19 00:00:45,990 --> 00:00:43,920 on the left and atlantis commander chris 20 00:00:46,709 --> 00:00:46,000 ferguson on the right 21 00:00:48,549 --> 00:00:46,719 for 22 00:00:50,869 --> 00:00:48,559 fossum is now 23 00:00:51,990 --> 00:00:50,879 secured in the upper torso portion of a 24 00:00:54,069 --> 00:00:52,000 suit 25 00:00:55,350 --> 00:00:54,079 flexing his arms to make sure he's 26 00:00:57,350 --> 00:00:55,360 comfortable 27 00:01:00,310 --> 00:00:57,360 and a good view from another camera in 28 00:01:02,869 --> 00:01:00,320 the quest airlock as you watch fossum on 29 00:01:05,270 --> 00:01:02,879 the right and garen on the left flexing 30 00:01:09,109 --> 00:01:05,280 their legs part of this exercise 31 00:01:21,429 --> 00:01:10,789 all the texts look good are you guys 32 00:01:24,950 --> 00:01:23,270 um cover is open you can egress the 33 00:01:27,350 --> 00:01:24,960 arrow lock if you want 34 00:01:29,429 --> 00:01:27,360 all right be attaching an anchor hook to 35 00:01:30,710 --> 00:01:29,439 the aft external d-ring 36 00:01:33,190 --> 00:01:30,720 ready you're ready to rock and roll 37 00:01:37,990 --> 00:01:33,200 ready to rock and roll let's go buddy 38 00:01:40,789 --> 00:01:38,950 we 39 00:01:43,030 --> 00:01:40,799 started out installing the new colt 40 00:01:45,749 --> 00:01:43,040 tools or the contingency operation lapid 41 00:01:48,870 --> 00:01:45,759 tools uh onto the uh 42 00:01:51,190 --> 00:01:48,880 back side of the pump module platform 43 00:01:52,789 --> 00:01:51,200 those went right into position uh what a 44 00:01:54,550 --> 00:01:52,799 great team working together to get that 45 00:01:57,109 --> 00:01:54,560 designed uh 46 00:01:57,830 --> 00:01:57,119 those tools worked flawlessly 47 00:02:00,550 --> 00:01:57,840 uh 48 00:02:01,670 --> 00:02:00,560 module hung up just a little bit on the 49 00:02:03,510 --> 00:02:01,680 uh 50 00:02:05,670 --> 00:02:03,520 external stowage platform before we got 51 00:02:07,429 --> 00:02:05,680 it released he gave it uh one more 52 00:02:09,990 --> 00:02:07,439 little try with the 53 00:02:11,190 --> 00:02:10,000 pgt bolt didn't turn at all so he gave 54 00:02:13,589 --> 00:02:11,200 it a little 55 00:02:14,869 --> 00:02:13,599 little yank and the whole thing came 56 00:02:16,710 --> 00:02:14,879 loose 57 00:02:18,710 --> 00:02:16,720 and 58 00:02:22,790 --> 00:02:18,720 there you can see it's starting to move 59 00:02:25,510 --> 00:02:22,800 it's about 1500 pounds so 60 00:02:26,869 --> 00:02:25,520 takes quite a bit to move it 61 00:02:28,869 --> 00:02:26,879 okay ronnie you're ready to lift up the 62 00:02:30,949 --> 00:02:28,879 front muscle let's do it 63 00:02:34,630 --> 00:02:30,959 it's 1400 pounds buddy 64 00:02:36,550 --> 00:02:34,640 let's kill this yeah okay 65 00:02:39,350 --> 00:02:36,560 pretty 66 00:02:41,509 --> 00:02:39,360 uh here you see uh ron uh controlling 67 00:02:43,589 --> 00:02:41,519 the whole thing on the robot arm and 68 00:02:45,670 --> 00:02:43,599 notice he's just very slowly turning the 69 00:02:47,270 --> 00:02:45,680 whole thing over it started out in one 70 00:02:50,070 --> 00:02:47,280 orientation kind of a heads-up 71 00:02:51,589 --> 00:02:50,080 orientation and he needed to turn it 180 72 00:02:54,229 --> 00:02:51,599 degrees around so that when he got down 73 00:02:55,670 --> 00:02:54,239 to the payload bay he'd be heads down 74 00:02:58,390 --> 00:02:55,680 in the payload bay and could install the 75 00:03:00,710 --> 00:02:58,400 pump module when he got down there 76 00:03:02,630 --> 00:03:00,720 now clear of external stowage platform 77 00:03:04,949 --> 00:03:02,640 number two headed down to atlanta's 78 00:03:07,830 --> 00:03:04,959 payload bay where the pump module will 79 00:03:10,309 --> 00:03:07,840 be secured on a truss support structure 80 00:03:12,949 --> 00:03:10,319 at the very back of the bay for the trip 81 00:03:14,869 --> 00:03:12,959 back home and an engineering evaluation 82 00:03:19,110 --> 00:03:14,879 to determine what caused the pump to 83 00:03:21,509 --> 00:03:19,120 fail on the night of july 31st last year 84 00:03:24,229 --> 00:03:21,519 there are three spare pump modules 85 00:03:26,070 --> 00:03:24,239 residing on various locations on the 86 00:03:31,350 --> 00:03:26,080 international space station for use in 87 00:03:31,360 --> 00:03:35,350 nice down spaceship you guys got here 88 00:03:40,710 --> 00:03:37,990 why thank you 89 00:03:41,589 --> 00:03:40,720 mike fossum is uh preparing the work 90 00:03:43,910 --> 00:03:41,599 site 91 00:03:46,390 --> 00:03:43,920 at the uh mission peculiar support 92 00:03:48,869 --> 00:03:46,400 structure as it's called the cargo truss 93 00:03:50,149 --> 00:03:48,879 basically at the back of the cargo bay 94 00:03:52,470 --> 00:03:50,159 of atlantis 95 00:03:54,949 --> 00:03:52,480 just above him is ron garan holding on 96 00:04:00,470 --> 00:03:54,959 to the pump module and its support 97 00:04:05,830 --> 00:04:02,470 the pump module and its attachment 98 00:04:08,470 --> 00:04:05,840 mechanism uh now aligned to a comparable 99 00:04:12,710 --> 00:04:08,480 uh attachment mechanism on this truss at 100 00:04:18,150 --> 00:04:15,030 you guys are uh good with the gca we can 101 00:04:21,349 --> 00:04:18,160 ngc angle breaks out gca is complete 102 00:04:28,070 --> 00:04:23,350 brakes are on you guys are clear for 103 00:04:32,629 --> 00:04:30,629 mike fossum has this robotic refueling 104 00:04:34,310 --> 00:04:32,639 mission the rrm in his hands he's on the 105 00:04:39,749 --> 00:04:34,320 end of the station's arm and moving out 106 00:04:46,469 --> 00:04:43,110 hey close encounter the obss 107 00:04:48,310 --> 00:04:46,479 hear that cheerful red light on the top 108 00:04:50,710 --> 00:04:48,320 here you see the robotics refueling 109 00:04:53,510 --> 00:04:50,720 mission uh just about to be installed 110 00:04:56,070 --> 00:04:53,520 and handed off to the dexter arm over on 111 00:04:57,830 --> 00:04:56,080 the lab nader 112 00:04:59,510 --> 00:04:57,840 i know that everybody at goddard was 113 00:05:00,629 --> 00:04:59,520 holding their breath here making sure 114 00:05:01,990 --> 00:05:00,639 that 115 00:05:03,909 --> 00:05:02,000 we were all 116 00:05:05,510 --> 00:05:03,919 sending them good wishes and 117 00:05:07,830 --> 00:05:05,520 we were able to get it installed onto 118 00:05:10,870 --> 00:05:07,840 the dexter just fine then it was off to 119 00:05:13,029 --> 00:05:10,880 install the missy or the materials iss 120 00:05:15,430 --> 00:05:13,039 experiment the small portion of that 121 00:05:17,510 --> 00:05:15,440 called the ormate 122 00:05:19,990 --> 00:05:17,520 took some photos of that that's material 123 00:05:22,790 --> 00:05:20,000 samples that are exposed to the 124 00:05:24,710 --> 00:05:22,800 ram and wake of space 125 00:05:27,270 --> 00:05:24,720 from there we went on to work on the 126 00:05:28,550 --> 00:05:27,280 grapple fixture that had the little wire 127 00:05:30,150 --> 00:05:28,560 sticking out through one of the latch 128 00:05:32,629 --> 00:05:30,160 doors you can see it getting cleared 129 00:05:35,430 --> 00:05:32,639 there and then pulled out of the way 130 00:05:36,870 --> 00:05:35,440 um that went just like the training it 131 00:05:40,230 --> 00:05:36,880 could not it was just like watching 132 00:05:42,070 --> 00:05:40,240 trainia video to see how well this went 133 00:05:43,830 --> 00:05:42,080 just like we had planned it doesn't 134 00:05:47,590 --> 00:05:43,840 always go that well but today it sure 135 00:05:50,790 --> 00:05:47,600 did and we were glad to see it 136 00:05:52,790 --> 00:05:50,800 our final task on the eva was installing 137 00:05:54,710 --> 00:05:52,800 the thermal cover that chris was talking 138 00:05:56,070 --> 00:05:54,720 about here you see it coming out of the 139 00:05:58,550 --> 00:05:56,080 bag you think of it a great big 140 00:06:01,909 --> 00:05:58,560 comforter coming out of the 141 00:06:04,230 --> 00:06:01,919 oru bag or the on orbit replacement oru 142 00:06:08,230 --> 00:06:05,749 here you can see it in its final 143 00:06:09,909 --> 00:06:08,240 configuration strapped down it's got 144 00:06:13,029 --> 00:06:09,919 nine velcro straps that hold it into 145 00:06:14,629 --> 00:06:13,039 position and 146 00:06:16,550 --> 00:06:14,639 about the time that they had it 147 00:06:18,790 --> 00:06:16,560 installed in this configuration the 148 00:06:20,390 --> 00:06:18,800 thermal officer in the front room in the 149 00:06:22,710 --> 00:06:20,400 mission control center stood up and 150 00:06:25,510 --> 00:06:22,720 turned around and said i can already see 151 00:06:27,110 --> 00:06:25,520 it starting to take effect 152 00:06:28,950 --> 00:06:27,120 he could already see it in his data just 153 00:06:31,430 --> 00:06:28,960 that fast so that's very successful 154 00:06:33,830 --> 00:06:31,440 project 155 00:06:36,150 --> 00:06:33,840 well i'd like to thank 156 00:06:37,990 --> 00:06:36,160 was a lot of teams whose hard work all 157 00:06:39,590 --> 00:06:38,000 came into play 158 00:06:40,710 --> 00:06:39,600 for this eva 159 00:06:42,950 --> 00:06:40,720 uh 160 00:06:44,469 --> 00:06:42,960 brown led a you know magnificent team of 161 00:06:45,990 --> 00:06:44,479 people that put together a lot of stuff 162 00:06:49,029 --> 00:06:46,000 and they had to do it 163 00:06:52,150 --> 00:06:49,039 in the hard way with uh ron and i 164 00:06:54,309 --> 00:06:52,160 uh with ron and me traveling a lot 165 00:06:55,990 --> 00:06:54,319 and uh not even in country at the same 166 00:06:58,469 --> 00:06:56,000 time together a lot they had to work 167 00:06:59,670 --> 00:06:58,479 really hard and had a really really well 168 00:07:00,830 --> 00:06:59,680 integrated 169 00:07:03,510 --> 00:07:00,840 plan put 170 00:07:06,870 --> 00:07:03,520 together with all of the products and 171 00:07:09,830 --> 00:07:06,880 the pieces that really came together and 172 00:07:11,350 --> 00:07:09,840 from uh from goddard the folk team 173 00:07:13,830 --> 00:07:11,360 the pump module team to figure out how 174 00:07:15,830 --> 00:07:13,840 to get that thing back 175 00:07:18,950 --> 00:07:15,840 a whole lot of work by a lot of a lot of 176 00:07:21,909 --> 00:07:18,960 teams around the country really 177 00:07:25,830 --> 00:07:21,919 really all folks came together and today